Karlovaç, Croatia
Size
3 MWe
Project Status
In Construction
Category
Biomass-to-energy
Applications
Electricity, biochar
Background
The site, located in the Industrial Zone Korana, in Karlovaç, contains a plant which once originally employed an early gasification technology from a third party. The plant was not able to achieve the designed operational availability and had to be closed. The plant will be developed in two phases of 1.5MWe each and when adapted with Advanced Gasification Technology and is commissioned, it will transform c.7,500 metric tonnes of locally sourced wood chips and forestry waste biomass per year from regional forests into green electricity for use by the local community as well as produce high quality biochar.





Project information
Our role: We are the project developer and provider of our gasification technology, working in a joint venture with Croatian project development partner, Sense ESCO, at the plant in Karlovaç, Croatia. We expect to be the O&M contractor.
Developments:
- First phase funding has been secured to accelerate completion of the detailed engineering design and order main equipment
- The plant has been acquired from the current land owner
- All licenses, permits, a grid connection and a power purchase agreement are in place
- The EPC provider, COSMI, an existing EQTEC partner, has been appointed.